On Ground & Temporary Security
Granby Terrace SCS Rail

Project Overview
Earlier this year, SCS Railways started work on the Southern section of HS2, Granby Terrace, located between Euston and West Ruislip train stations.
The scale of work scheduled for this section is vast and the project is estimated to carry on until 2026. On the south side of this site, they realised their work came very close to the curb line and in fact needed to be stepped out into the road. With this being said they called for a solution that could be installed quickly and assembled fairly easily as not to delay the project.
Another requirement found by SCS Railways was that the chosen system must be able to be reused and realigned if needs be, unlike timber hoarding on the market which can be wasteful and not cost effective. After searching for an alternative to timber hoarding on our website, the CLD Systems HoardSafe was selected.
HoardSafe is manufactured from recycled composite plastic panels with modular concrete blocks, which means the system can be erected and dismantled multiple times for reuse and realignment. In addition to these requirements, the necessity for restricted visibility was increasing; another reason why HoardSafe was used. They found that due to the work being so close to public footpaths they were attracting attention from the public. As HoardSafe is a solid panel system, it fit the brief whilst also protecting the perimeter and creating a secure site for those at work.

The Brief
SCS Railways and HS2 had very specific requirements for this project in order to keep both workers and the public safe.
- A system that’s quick and easy to install
- Restrict visibility from outside whislt protecting both workers and public
- Ability to reuse and realign if needed
- Must follow temporary works forums regulations
Systems Used

We were having issues with attracting more attention such as local residents taking photos. We were looking at sheeting as a solution but then going to the CLD website, the better and tidier alternative was the HoardSafe that had the modular nature, fast installation and restricted visibility onto site.